The project of a ventilated facade made of stone and landscaping of the adjacent territory of the stadium "Krasnodar"
The scope of work included:
- architectural design
- development of KMD drawings
- production and supply of stone products
- production and supply of the MAS facade system
- installation of a ventilated facade
Stone: Kanfanar limestone, Jurassic
Facade system: MAS
Production of stone products -Sarhang Stone
Architectural design - Sarhang Stone
Facade system - Sarhang Stone
Installation of a ventilated facade -Sarhang Stone .